PvPro.ch

Cantonal information · Last updated September 2026

Solar panels in Neuchâtel: requirements and battery storage in 2026

Neuchâtel combines clear own-electricity requirements for new buildings with a new cantonal subsidy for photovoltaic batteries. It is essential to keep the two instruments separate.

Compare up to 3 solar quotes

Free · No obligation · Suitable specialist companies

Distinguishing own electricity in new buildings from battery storage

The two minimum values for new buildings apply together: the energy reference area, also called ERA, determines the required capacity. At the same time, a minimum capacity applies independently of this area-based calculation.

This is a requirement to generate electricity on site, not a requirement to buy a battery. Cantonal storage funding is a separate instrument and may also be relevant to an existing photovoltaic system.

Sources: 1

Does your battery qualify for the cantonal programme?

Check the following conditions together. The contribution formula alone is not a funding commitment; in particular, not all installed storage capacity can necessarily be taken into account.

2026 battery funding check

Contribution formula: CHF 800 per installation + CHF 80/kWh of installed storage capacity.

>3 kWh

Capacity >3 kWh

The battery must have a capacity greater than 3 kWh.

Sources: 2,3

Eligible capacity

Eligible capacity is limited to twice the installed photovoltaic capacity in kWp.

Maximum 2 × installed photovoltaic capacity in kWp

Sources: 2,3
max. 50%

Contribution cap

The total contribution may not exceed 50% of the total investment.

Sources: 2,3

Building, solar system and self-consumption

A residential building, an on-site photovoltaic system and self-consumption of part of the solar electricity are required.

Sources: 2,3

Commissioned from 1 March 2026

Battery storage commissioned from 1 March 2026 is eligible. The corresponding electrical safety certificate is decisive.

Electrical safety certificate is decisive

Sources: 2,3
Sources: 2,3

Compare quotes on the same basis

The most useful comparison: several quotes for the same project.

Compare up to 3 solar quotes

Free · No obligation · Suitable specialist companies

Adding a battery to an existing photovoltaic system

An existing photovoltaic system does not rule out the battery subsidy. Funding also applies with an existing photovoltaic system, provided it is on site, some solar electricity is self-consumed and the remaining conditions are met.

  • An existing on-site photovoltaic system is permitted.
  • Some of the solar electricity must be self-consumed.
  • The other battery funding check conditions continue to apply.

The distinction therefore remains important: the requirement of 15 W/m² ERA and at least 1 kW applies to new buildings. The battery check, by contrast, may also concern an addition to an existing photovoltaic system.

Sources: 2,3,1

Which details matter for the funding check?

For assessment, clearly show installed photovoltaic capacity in kWp, installed storage capacity and total investment separately. This allows eligible capacity to be checked against photovoltaic capacity and the contribution cap to be understood.

  • Consider installed photovoltaic capacity in kWp and installed storage capacity separately.
  • Show total investment for the 50% cap.
  • Include the electrical safety certificate and self-consumption in the check.

For storage commissioned from 1 March 2026, the corresponding electrical safety certificate is decisive. The residential building, on-site photovoltaic system and self-consumption must also be considered together with the other funding conditions.

Sources: 2,3

Cost of a photovoltaic system with battery storage

Costs do not depend on photovoltaic capacity alone. For a battery, usable capacity, inverter compatibility and integration into the existing or new system are particularly important. The cantonal contribution is a funding rule, not a guarantee of a particular financial return.

  • usable storage capacity and suitable battery size
  • inverter and technical compatibility
  • distribution board and other electrical work
  • integration into a new or existing photovoltaic system

Compare quotes using the same project basis. Battery sizing should be clear separately from photovoltaic sizing so that output, capacity and electrical work are not conflated.

Sources: 2,3

Comparing suitable quotes for solar and storage

PvPro helps homeowners compare up to three suitable photovoltaic quotes and, if requested, storage solutions without obligation.

Ask for photovoltaic output, installed and usable storage capacity, and electrical work to be listed separately. This lets you assess the battery funding check and technical implementation on the same basis.

Solar project in Neuchâtel

Map and guidance for your solar project in Neuchâtel.

Neuchâtel

Frequently asked questions

How much own electricity must a new building in Neuchâtel generate?
For new buildings, cantonal energy law requires at least 15 W/m² of energy reference area, or ERA, and at least 1 kW of installed capacity.
Sources: 1
When did cantonal funding for photovoltaic batteries begin?
Battery storage commissioned from 1 March 2026 is eligible; the corresponding electrical safety certificate is decisive.
Sources: 2,3
How is the battery subsidy calculated?
The contribution is CHF 800 per installation plus CHF 80 per kWh of installed storage capacity and may not exceed 50% of the total investment.
Sources: 2,3
What battery size is funded?
The battery must have a capacity greater than 3 kWh; eligible capacity is limited to twice the installed photovoltaic capacity in kWp.
Sources: 2,3
Can a battery be added to an existing photovoltaic system?
Yes. Funding also applies with an existing photovoltaic system, provided it is on site, some solar electricity is self-consumed and the remaining conditions are met.
Sources: 2,3

Plan your solar project in concrete terms

Start with a clear request for your specific project.

Compare up to 3 solar quotes

Free · No obligation · Suitable specialist companies

Sources and last update

Last updated: 15 September 2026

  • Canton of NeuchâtelImplementing Regulation for the Cantonal Energy Act (RELCEn)Official source
  • Canton of Neuchâtel740.13: Order on subsidies for photovoltaic electricity storage batteries (ASBaSt), 4 February 2026Official source
  • Canton of NeuchâtelSubsidies for domestic photovoltaic electricity storage batteries | ne.chOfficial source